Loading... Please wait...
  • Image 1

Elite Screens-100" Motorised 16:9 Projector Screen, Tensioned Drop Cinetension2 (long Leader) SKU TE100HW2-E50

RRP: $2,999.00
$2,276.24 (You save $722.76)
SKU:
TE100HW2-E50
Availability:
26.10.2018
Shipping:
Calculated at checkout
Quantity:

 

Product Description

Elite Screens-100" Motorised 16:9 Projector Screen, Tensioned Drop Cinetension2 (long Leader)

 

Product description

Style:Spectrum Series - Black Case  |  Color:Spectrum Series - Black  |  Size:16:9, 100-inch

 

Elite Screens Spectrum series is the absolute solution
for anyone who is looking for a high quality electric
projection screen at a budget friendly price.


Elite Screens Spectrum series features include:

  • Durable casing that easily installs to your wall or ceiling
  • Includes install kit
  • Includes infrared (IR) remote, detachable 3-way wall switch, and 12V trigger cable
  • 2-Year Manufactures Warranty and Lifetime Product Support by
    Elite Screens; a ISO9001 manufacturer since 2004


Elite Screens Spectrum series includes Elite Screens' MaxWhite FRONT
projection screen material which features:

  • 180° Wide Viewing Angle
  • 1.1 gain
  • Active 3D, 4K Ultra HD,and HDR ready!
  • Black masking borders enhance picture contrast
  • Black Backed to Prevent Light Penetration/Loss



Elite Screens is focused on providing the best quality products at affordable
prices while offering exceptional service. Since 2004, Elite Screens has become a
global leader in projection screen manufacturing through its headquarters in the
US and branch offices in Europe, Japan, Australia, India, Taiwan, and China. With a
focus on superior product and service, Elite Screens is dedicated to making projection
screens for any projection environment. Ask about Elite’s 2-year warranty and
3-year ENR-G enhanced warranty.

 


Product information

Style:Spectrum Series - Black Case  |  Color:Spectrum Series - Black  |  Size:16:9, 100-inch
Product Dimensions 3.1 x 100.2 x 61.1 inches
Item Weight 20.1 pounds
Shipping Weight 29.9 pounds (View shipping rates and policies)
Domestic Shipping Currently, item can be shipped only within the U.S. and to APO/FPO addresses. For APO/FPO shipments, please check with the manufacturer regarding warranty and support issues.
International Shipping This item is not eligible for international shipping.Learn More
ASIN B000YTRFEG
Item model number ELECTRIC100H
Batteries 2 AAA batteries required. (included)
Customer Reviews  
4.2 out of 5 stars
Best Sellers Rank #5,784 in Electronics (See Top 100 in Electronics) 
#17 in Electronics > Televisions & Video >Projection Screens 
#22,547 in Electronics > Accessories & Supplies

Find Similar Products by Category

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Write review

Related Products

our newsletter

Recent Updates

Categories

Click the button below to add the Elite Screens-100" Motorised 16:9 Projector Screen, Tensioned Drop Cinetension2 (long Leader) SKU TE100HW2-E50 to your wish list.